高清无码网址在线-浪友视频-2021国产精品自拍-国产亚洲欧美精品永久不卡|www.tuitui8.com

7*24小時工作時間隨時全心服務

0531-85919987

產品導航

Technology

您的當前位置:首頁 > Technology
Installation method of SH0308B air release value tester
2021-04-19 10:33:28 admin 1139

Installation method of SH0308B air release value tester

1. After the instrument is unpacked, carefully remove the packaging, check whether the accessories are complete and damaged against the packing list of the instrument accessories.
If the accessories are incomplete or damaged, please contact our company in time.
2. Put the jacket glass test tube on the test rack.
3. Connect the water inlet of the jacketed glass test tube with the water outlet of the host, and connect the water outlet of the jacketed glass test tube with the water inlet of the host, as shown in Figure 2:


4. Connect the air outlet of the air compressor with the vent port behind the main engine.
5. Connect the air compressor power plug.
6. Connect the mainframe power supply.
7. If no water is injected, the drainage pipe above the back can be connected to the sink to prevent overflow due to excessive water injection.